Purpose
Use Proposed Root Balls and Root
Barriers to model tree planting requirements, assess underground coordination,
protect adjacent infrastructure, and document tree establishment requirements
within the Revit landscape model.
Root Balls represent the excavation and
root mass associated with a proposed tree, while Root Barriers are used to
manage root growth and protect nearby assets such as utilities, paving,
structures, and highways.
Prerequisites
Before creating Root Balls and Root
Barriers:
- Proposed trees have been placed in
the model.
- Tree species and planting
specifications have been assigned.
- Root ball dimensions are available
from project standards, supplier information, or planting specifications.
- Areas requiring root protection have
been identified.
- Appropriate visibility settings are
enabled.
Outcome: The project is ready for root zone
modelling and coordination.
1. Place Proposed Trees
- Open the planting design model.
- Select the required tree type from
the planting palette.
- Place trees in their proposed
locations.
- Verify tree species, specifications,
and planting sizes.
Outcome: Proposed trees are established within the
model.
2. Generate Proposed Root
Balls
- Open the Root Ball tools.
- Select one or more proposed trees.
- Run the Create Proposed Root Balls
command.
- Allow ArtisanRV to generate root
balls using the associated planting information.
- Review the generated root ball
geometry in plan and 3D views.
Outcome: Root balls are automatically generated
and linked to the selected trees.
3. Review and Adjust Root Ball
Dimensions
- Select a root ball.
- Open the editing tools or
properties.
- Review:
- Root ball diameter
- Root ball depth
- Shape and extents
- Associated tree
- Modify dimensions where required by
specification.
- Save the changes.
Outcome: Root ball geometry accurately reflects
project requirements.
4. Create Root Barriers
- Open the Root Barrier tools.
- Select the proposed tree or
associated root ball.
- Choose the Root Barrier command.
- Define the barrier alignment
adjacent to:
- Utilities
- Roads and highways
- Footways and paving
- Building foundations
- Retaining
structures
- Specify:
- Barrier type
- Depth
- Length
- Offset from root ball where
required
- Complete the placement.
- Review the barrier in plan, section,
and 3D views.
Outcome: Root barriers are created and positioned
to control future root growth.
5. Review Coordination
- Display:
- Root balls
- Root barriers
- Underground services
- Structures
- Hard landscape
elements
- Review potential conflicts.
- Adjust:
- Tree position
- Root ball dimensions
- Root barrier
alignment
- Resolve any identified coordination
issues.
Outcome: Planting infrastructure is fully
coordinated with the wider project model.
6. Control Visibility
- Open ArtisanRV Visibility Options.
- Enable or disable:
- Proposed Root Balls
- Root Barriers
- Review the display in:
- Planting plans
- Coordination plans
- Sections
- 3D views
- Confirm graphical representation is
suitable for documentation.
Outcome: Root infrastructure is displayed
appropriately for each view type.
7. Schedule Root
Infrastructure
- Open project schedules.
- Refresh planting schedules where
required.
- Review:
- Tree type
- Root ball size
- Root ball quantity
- Root barrier type
- Root barrier length
- Barrier depth
- Verify quantities against project
requirements.
Outcome: Accurate root infrastructure data is
available for documentation and project coordination.
8. Document the Design
- Place coordinated views onto sheets.
- Include:
- Planting plans
- Root barrier layouts
- Root ball layouts
- Schedules
- Verify consistency across:
- Plans
- Sections
- Details
- Schedules
- Publish project
documentation.
Outcome: Root balls and root barriers are fully
coordinated and documented.
Verification Checklist
- ✅ Proposed trees have been placed.
- ✅ Root balls have been created.
- ✅ Root ball dimensions have been
verified.
- ✅ Root barriers have been added
where protection is required.
- ✅ Barrier depths and lengths have
been reviewed.
- ✅ Utilities and structures have been
coordinated.
- ✅ Visibility settings are configured
correctly.
- ✅ Schedules report accurate
quantities.
- ✅ Documentation has been
updated.
Recommended Next Step
After completing Root Ball and Root
Barrier modelling, perform a final underground coordination review to verify
tree establishment requirements, utility clearances, pavement protection
measures, and construction documentation before issuing the design
package.