Purpose
The Terrain Tools functions are used to
create, modify, analyse, and manage terrain models within an Artisan project.
These tools support the development of existing and proposed ground surfaces,
enabling accurate grading, earthworks calculations, and terrain
visualisation.
Standard
Workflow
1. Prepare Terrain
Data
Before working with terrain models:
- Open the project drawing.
- Verify survey information has been imported
correctly.
- Confirm contours, spot levels, breaklines, and terrain
data are positioned accurately.
- Ensure all terrain-related objects are on the appropriate
layers.
- Review project coordinate systems and
units.
2. Create a Terrain Model
To create a new terrain surface:
- Select the terrain creation tool.
- Choose the source data (contours, points, breaklines, or
survey data).
- Define the required terrain settings.
- Generate the terrain model.
- Review the generated surface for errors or
inconsistencies.
3. Edit Terrain Surfaces
When design development requires modifications:
- Select the terrain model.
- Apply the appropriate editing tools.
- Add, remove, or adjust terrain data.
- Regenerate the surface if required.
- Verify that changes are reflected correctly throughout
the model.
4. Create Proposed Terrain
To develop grading proposals:
- Copy or derive a proposed surface from existing
terrain.
- Modify levels to achieve the required design
intent.
- Introduce grading elements, contours, and control
points.
- Check transitions, slopes, and level changes.
- Validate accessibility and drainage
requirements.
5. Analyse Terrain
Once the terrain model has been developed:
- Review contour representation.
- Check spot levels.
- Analyse slopes and gradients.
- Identify potential drainage issues.
- Verify grading relationships with adjacent
features.
- Review cut-and-fill implications where
applicable.
6. Generate Terrain Outputs
For project documentation:
- Produce contour drawings.
- Generate level plans.
- Create grading layouts.
- Produce earthworks calculations if required.
- Generate visualisations and model outputs as
needed.
7. Validate the Terrain Model
Before project issue:
- Confirm terrain boundaries are correct.
- Verify source survey information has been referenced
accurately.
- Check proposed grading achieves design
objectives.
- Validate contour intervals and level data.
- Review earthworks quantities where
applicable.
- Ensure all outputs match project
standards.
8. Save and Update Project Records
Once terrain work is complete:
- Save the drawing.
- Update associated project documentation.
- Regenerate schedules and outputs if required.
- Record design revisions where
applicable.
Recommended Standard Practice
- Verify survey and terrain source data.
- Create the existing terrain model.
- Develop and refine proposed terrain.
- Review levels, slopes, and grading.
- Generate project outputs.
- Perform quality assurance checks.
- Save and issue updated project
information.
Typical Terrain Tool Tasks
| Task |
Purpose |
| Create Terrain Model |
Generate a surface from survey data |
| Edit Terrain |
Modify existing terrain information |
| Create Proposed Surface |
Develop design grading solutions |
| Analyse Slopes |
Assess gradients and terrain performance |
| Generate Contours |
Produce contour-based drawings |
| Calculate Earthworks |
Evaluate cut-and-fill quantities |
| Produce Outputs |
Create grading and terrain
documentation |
Quality Control Checklist
Before completing work:
✅ Survey data verified
✅ Terrain model generated
successfully
✅ Surface boundaries checked
✅ Proposed grading reviewed
✅
Slopes and drainage validated
✅ Contours display correctly
✅ Earthworks
calculations reviewed (if applicable)
✅ Outputs meet project standards
✅
Drawing saved successfully
Outcome
Following the Terrain Tools workflow ensures that terrain
models are created and managed consistently, supporting accurate grading design,
surface analysis, earthworks calculations, and production of reliable
construction and landscape documentation.