Purpose
The Planting Schedules tools are used to
generate, manage, and maintain accurate schedules of planting information within
an Artisan project. Planting schedules provide a coordinated record of plant
species, quantities, specifications, and planting requirements, ensuring
consistency between planting plans and construction
documentation.
Standard
Workflow
1. Prepare Planting
Data
Before creating a planting schedule:
- Open the project drawing.
- Ensure all planting areas and individual plants have been
placed correctly.
- Verify plant information is complete and up to
date.
- Confirm plant quantities have been calculated
correctly.
- Review project standards for schedule formatting and
content.
2. Review Planting Information
Prior to schedule generation:
- Check all plant species assignments.
- Verify botanical names.
- Confirm plant specifications are correct.
- Review planting densities and quantities.
- Resolve any duplicate or incomplete planting
records.
3. Generate a Planting Schedule
To create a schedule:
- Open the Planting Schedule
tool.
- Select the schedule type required.
- Define schedule settings and formatting
options.
- Choose the planting data to include.
- Generate the schedule.
- Review the initial output for
completeness.
4. Configure Schedule Content
Tailor the schedule to project requirements by including
relevant information such as:
- Botanical name
- Common name
- Plant category
- Plant size or specification
- Quantity
- Planting density
- Notes and special requirements
Ensure all required project information is displayed
consistently.
5. Review and Validate Schedule Data
Once generated:
- Review all schedule entries.
- Verify quantities against the planting plan.
- Confirm species information is accurate.
- Check for missing plant records.
- Validate plant specifications and notes.
6. Update Schedules Following Design Changes
When revisions occur:
- Update the planting design.
- Review modified planting areas.
- Regenerate the planting schedule.
- Check revised quantities and specifications.
- Replace outdated schedule information.
7. Coordinate with Planting Plans
Before project issue:
- Compare schedule data against planting plans.
- Verify all plants shown on the drawing appear within the
schedule.
- Confirm schedule totals match plan
quantities.
- Resolve any discrepancies.
- Ensure labels, legends, and schedules remain
coordinated.
8. Format Schedule for Presentation
For project deliverables:
- Review table layout.
- Check text formatting and readability.
- Adjust column widths where required.
- Ensure compliance with company and project
standards.
- Verify plotting and printing appearance.
9. Insert Schedule into the Drawing
When documentation is complete:
- Place the schedule in the appropriate drawing sheet or
layout.
- Position the table clearly within the
drawing.
- Verify scale-independent readability.
- Confirm title and references are correct.
- Review the final sheet presentation.
10. Validate and Save
Before issuing documentation:
- Review all schedule data.
- Verify quantities and specifications.
- Confirm coordination with plans and labels.
- Check formatting and presentation standards.
- Save the drawing and update project
records.
Recommended Standard Practice
- Complete the planting design.
- Verify all plant data and quantities.
- Generate the planting schedule.
- Review species information and quantities.
- Coordinate the schedule with planting plans and
labels.
- Format the schedule for presentation.
- Insert the schedule into the drawing layout.
- Complete quality assurance checks.
- Save and issue project documentation.
Typical Planting Schedule Tasks
| Task |
Purpose |
| Generate Schedule |
Create a planting data table |
| Update Schedule |
Reflect design revisions |
| Validate Quantities |
Ensure planting accuracy |
| Review Specifications |
Confirm plant requirements |
| Coordinate Documentation |
Align plans, labels, and schedules |
| Format Schedule |
Improve presentation quality |
| Insert into Layout |
Prepare for issue and
printing |
Quality Control Checklist
Before completing work:
✅ All planting areas included in the schedule
✅ Botanical
names verified
✅ Plant quantities checked against the plan
✅
Specifications reviewed for accuracy
✅ Duplicate records removed
✅
Schedule formatting complies with standards
✅ Plant labels coordinated with
schedule information
✅ Layout presentation reviewed
✅ Plot appearance
checked
✅ Drawing saved successfully
Outcome
Following the Planting Schedules workflow ensures that
planting information is accurately documented, coordinated, and presented
throughout the project lifecycle. Proper schedule management reduces
documentation errors, improves communication between project stakeholders, and
supports the production of reliable planting plans and construction
information.