Previous topicNext topic

Help > ArtisanACAD_27.1.56.0 Planting > Planting Schedules >

Artisan Landscape for AutoCAD & BricsCAD

Standard Workflow - Planting Schedules

Purpose

The Planting Schedules tools are used to generate, manage, and maintain accurate schedules of planting information within an Artisan project. Planting schedules provide a coordinated record of plant species, quantities, specifications, and planting requirements, ensuring consistency between planting plans and construction documentation.


Standard Workflow

1. Prepare Planting Data

Before creating a planting schedule:

2. Review Planting Information

Prior to schedule generation:

  1. Check all plant species assignments.
  2. Verify botanical names.
  3. Confirm plant specifications are correct.
  4. Review planting densities and quantities.
  5. Resolve any duplicate or incomplete planting records.

3. Generate a Planting Schedule

To create a schedule:

  1. Open the Planting Schedule tool.
  2. Select the schedule type required.
  3. Define schedule settings and formatting options.
  4. Choose the planting data to include.
  5. Generate the schedule.
  6. Review the initial output for completeness.

4. Configure Schedule Content

Tailor the schedule to project requirements by including relevant information such as:

Ensure all required project information is displayed consistently.

5. Review and Validate Schedule Data

Once generated:

  1. Review all schedule entries.
  2. Verify quantities against the planting plan.
  3. Confirm species information is accurate.
  4. Check for missing plant records.
  5. Validate plant specifications and notes.

6. Update Schedules Following Design Changes

When revisions occur:

  1. Update the planting design.
  2. Review modified planting areas.
  3. Regenerate the planting schedule.
  4. Check revised quantities and specifications.
  5. Replace outdated schedule information.

7. Coordinate with Planting Plans

Before project issue:

8. Format Schedule for Presentation

For project deliverables:

  1. Review table layout.
  2. Check text formatting and readability.
  3. Adjust column widths where required.
  4. Ensure compliance with company and project standards.
  5. Verify plotting and printing appearance.

9. Insert Schedule into the Drawing

When documentation is complete:

  1. Place the schedule in the appropriate drawing sheet or layout.
  2. Position the table clearly within the drawing.
  3. Verify scale-independent readability.
  4. Confirm title and references are correct.
  5. Review the final sheet presentation.

10. Validate and Save

Before issuing documentation:


Recommended Standard Practice

  1. Complete the planting design.
  2. Verify all plant data and quantities.
  3. Generate the planting schedule.
  4. Review species information and quantities.
  5. Coordinate the schedule with planting plans and labels.
  6. Format the schedule for presentation.
  7. Insert the schedule into the drawing layout.
  8. Complete quality assurance checks.
  9. Save and issue project documentation.

Typical Planting Schedule Tasks

Task Purpose
Generate Schedule Create a planting data table
Update Schedule Reflect design revisions
Validate Quantities Ensure planting accuracy
Review Specifications Confirm plant requirements
Coordinate Documentation Align plans, labels, and schedules
Format Schedule Improve presentation quality
Insert into Layout Prepare for issue and printing

Quality Control Checklist

Before completing work:

✅ All planting areas included in the schedule
✅ Botanical names verified
✅ Plant quantities checked against the plan
✅ Specifications reviewed for accuracy
✅ Duplicate records removed
✅ Schedule formatting complies with standards
✅ Plant labels coordinated with schedule information
✅ Layout presentation reviewed
✅ Plot appearance checked
✅ Drawing saved successfully


Outcome

Following the Planting Schedules workflow ensures that planting information is accurately documented, coordinated, and presented throughout the project lifecycle. Proper schedule management reduces documentation errors, improves communication between project stakeholders, and supports the production of reliable planting plans and construction information.