Previous topicNext topic

Help > ArtisanACAD_27.1.56.0 Terrain Tools > Levels >

Artisan Landscape for AutoCAD & BricsCAD

Standard Workflow - Levels

Purpose

The Levels tools are used to create, manage, display, and report level information within an Artisan project. These tools support grading design, construction documentation, drainage coordination, and accurate communication of existing and proposed site elevations.


Standard Workflow

1. Prepare the Drawing

Before working with levels:

2. Create Level Points

To add level information:

  1. Select the appropriate level creation tool.
  2. Specify the location for the level point.
  3. Enter or assign the required elevation value.
  4. Apply the correct level style and annotation settings.
  5. Place the level marker within the drawing.
  6. Verify the displayed level value is correct.

3. Edit Existing Levels

When updates are required:

  1. Select the level point to be modified.
  2. Open the editing function.
  3. Update the elevation, annotation, or display settings.
  4. Save the changes.
  5. Review any associated grading or terrain information affected by the update.

4. Create Proposed Levels

For grading and design development:

  1. Identify key design locations requiring level control.
  2. Place proposed level points.
  3. Assign design elevations.
  4. Check relationships between adjacent levels.
  5. Confirm compliance with drainage, accessibility, and grading requirements.

5. Label and Annotate Levels

To improve drawing clarity:

6. Review Level Relationships

Before issuing drawings:

7. Generate Level Information

For project documentation:

  1. Create level schedules where required.
  2. Produce grading plans.
  3. Generate construction drawings containing level information.
  4. Review outputs for completeness and accuracy.
  5. Ensure level annotations remain coordinated across all deliverables.

8. Validate and Save

Before finalising work:


Recommended Standard Practice

  1. Verify survey and project datum information.
  2. Create and review existing levels.
  3. Develop proposed levels for design areas.
  4. Check relationships between adjacent levels.
  5. Validate drainage and accessibility requirements.
  6. Generate level schedules and drawing outputs.
  7. Complete quality assurance checks.
  8. Save and issue project information.

Typical Levels Tasks

Task Purpose
Create Level Point Add elevation information to a drawing
Edit Level Point Modify existing elevation data
Place Proposed Levels Define grading and design levels
Annotate Levels Display elevation information clearly
Review Gradients Check level relationships and falls
Generate Schedules Report level data for documentation
Coordinate with Terrain Ensure grading consistency

Quality Control Checklist

Before completing work:

✅ Project datum verified
✅ Survey levels validated
✅ Existing levels checked
✅ Proposed levels reviewed
✅ Annotation standards applied
✅ Drainage falls confirmed
✅ Accessibility requirements assessed
✅ Schedules reviewed
✅ Drawing saved successfully


Outcome

Following the Levels workflow ensures that site elevation information is managed consistently and accurately throughout the project lifecycle. Correct use of levels supports grading design, drainage coordination, construction documentation, and the production of reliable landscape and civil engineering deliverables.